Improvements to the electrical system in the Van Leer Building require a planned outage.

Required electrical work at Van Leer will begin March 16 at 7:00 a.m. Power will be restored to specific areas throughout the week (see details below).

4kV motors lab - restored Monday Noon 3/18.

SWB loads - restored Monday Noon 3/18.

  • Interdisciplinary Design Commons Maker Space (old Rotunda). All floors.
  • Lighting for the west half of building- 1st-4th floors.
  • Lighting for the 5th floor.
  • W139 Structural and Research Lab.
  • W115 Lab power.

NEA loads - restored Tuesday Morning 3/19.

  • Lighting for the east half of building- 1st-4th floors.
  • Cleanroom receptacles and equipment.
  • Cleanroom lighting, HVAC, and exhaust fans
  • Room E396E Spectra-Physics DC Power Supply (not in use).
  • Room C248 furniture receptacles.

NWBH loads - restored Tuesday Morning 3/19.

  • DC generators and W139 Lab.
  • Mechanical systems including air-handling units, chilled water, and condensate pumps.
  • Emergency egress lighting (can be supplied by the generator)
  • Elevator.

NWBL loads - restored Wednesday Morning 3/20.

  • Main Communications Room W237.
  • W115 Lab power.
  • W116A Shop power.
  • W139 Structural and Research Lab
  • SW Communications Rooms- 2nd - 4th floors.
  • Receptacles for west half of building- 2nd - 4th floor.
  • Receptacles for the 5th floor.
  • Elevator machine room air-conditioning.
  • Roof Power

SEA loads - restored Thursday Noon 3/21.

  • Cleanroom receptacles and equipment.
  • Cleanroom office area receptacles- west side.
  • Office receptacles- 1st floor east side.
  • Mechanical Room- JCI controls, receptacles, and power for 120V pumps.
  • Elevator cab lights.
  • SE Communications Rooms- 2nd - 4th floors.
  • Receptacles for east half of building- 2nd - 4th floors.